Measure Z Ballot Language

The full text of the Bond Measure is below and can be downloaded here (PDF).

BOND AUTHORIZATION

By approval of this measure by at least 55 percent of the registered voters voting on the measure, the Cupertino Union School District will be authorized to issue and sell bonds of up to $ 347 million in aggregate principal amount at interest rates not to exceed legal limits and to provide financing for the specific types of school facilities projects listed in the Bond Project List described below, subject to all the accountability requirements specified below. The District has determined that in order to provide sufficient funds to undertake the facilities projects described below, it is advisable to submit two separate measures authorizing the issuance of general obligation bonds of the District for that purpose, and accordingly the District has called another, separate bond election to be held concurrently with this bond election.

ACCOUNTABILITY REQUIREMENTS

The provisions in this section are specifically included in this measure in order that the voters and taxpayers in the District may be assured that their money will be spent wisely. Expenditures to address specific facilities needs of the District will be in compliance with the requirements of Article XIIIA, Section 1(b)(3), of the State Constitution and the Strict Accountability in Local School Construction Bonds Act of 2000 (codified at Education Code Sections 15264 and following.)

Evaluation of Needs. The School Board has identified detailed facilities needs of the District and has determined which projects to finance from a local bond. The School Board hereby certifies that it has evaluated safety, class size reduction, enrollment growth, and information technology needs in developing the Bond Project List shown below.

Independent Citizens’ Oversight Committee. Following approval of this measure, the School Board will establish an Independent Citizens’ Oversight Committee, under Education Code Sections 15278 and following, to ensure bond proceeds are expended only on the types of school facilities projects listed below. The Oversight Committee will be established within 60 days of the date when the results of the election appear in the minutes of the School Board. No employee or official of the District and no vendor, contractor or consultant of the District shall be appointed to the Oversight Committee. The School Board may determine that its existing Oversight Committee which oversees the expenditure of bond proceeds of prior bond measures of the District shall simultaneously serve as the Oversight Committee for this bond measure.

Performance Audits. The School Board will conduct annual, independent performance audits to ensure that the bond proceeds have been expended only on the school facilities projects listed below.

Financial Audits. The School Board will conduct annual, independent financial audits of the bond proceeds until all of those proceeds have been spent for the school facilities projects listed below.

Government Code Accountability Requirements. As required by Section 53410 of the Government Code, (1) the specific purpose of the bonds is set forth in this Full Text of the Bond Measure, (2) the proceeds from the sale of the bonds will be used only for the purposes specified in this measure, and not for any other purpose, (3) the proceeds of the bonds, when and if issued, will be deposited into a building fund to be held by the Santa Clara County Treasurer, as required by the California Education Code, and (4) the Superintendent of the District shall cause an annual report to be filed with the Board of Education of the District not later than January 1 of each year, which report shall contain pertinent information regarding the amount of funds collected and expended, as well as the status of the projects listed in this measure, as required by Sections 53410 and 53411 of the Government Code.

NO TEACHER OR ADMINISTRATOR SALARIES

Proceeds from the sale of bonds authorized by this measure shall be used only for the purposes specified in Article XIII A, Section 1(b)(3), those being for the construction, reconstruction, rehabilitation, or replacement of school facilities, including the furnishing and equipping of school facilities, and the acquisition or lease of school facilities, and not for any other purpose, including teacher and administrator salaries and other school operating expenses.

STATE MATCHING FUNDS

The following statement is included in this measure pursuant to Education Code Section 15122.5: Approval of this measure does not guarantee that the proposed project or projects that are the subject of bonds under this measure will be funded beyond the local revenues generated by this measure. The District’s proposal for the project or projects described below may assume the receipt of matching state funds, which, if available, could be subject to appropriation by the Legislature or approval of a statewide bond measure.

INFORMATION ABOUT ESTIMATES AND PROJECTIONS INCLUDED IN BALLOT

Voters are informed that any estimates or projections in this bond measure and related ballot materials, including relating to estimated rates of ad valorem property taxes, the duration of issued bonds and related levies and collections of ad valorem property taxes are provided as informational only. Such amounts are estimates and are not maximum amounts or limitations on the terms of the bonds, the tax rate or the duration of the levy supporting repayment of issued bonds. Such estimates depend on numerous variables which are subject to variation and change over the term of the District’s overall facilities and bond financing plan, including but not limited to the amount of bonds issued and outstanding at any one time, the interest rates applicable to issued bonds, market conditions at the time of sale of the bonds, when bonds mature, timing of project needs and changes in assessed valuations in the District. As such, while such estimates and approximations are provided based on information currently available to the District and its current expectations, such estimates and approximations are not limitations and are not binding upon the District. In addition, the abbreviated and condensed statement of the bond measure presented to voters on the ballot label which is subject to a word count limitation imposed by State law does not limit the scope and complete meaning of the measure provided in this Full Text of the Bond Measure and related ballot materials.

BOND PROJECT LIST

Scope of Projects. Bond proceeds will be expended on the construction, modernization, reconstruction, rehabilitation, replacement, or otherwise improve school facilities of the Cupertino Union School District, including furnishing and equipping, and the acquisition or lease of real property for school facilities and not for any other purpose, including teacher and administrator salaries or other school operating expenses, in compliance with California Constitution Article XIIIA, Section 1(b)(3). This measure authorizes bond projects to be undertaken at all current and future District sites.

School Facility Project List. The items presented on the following list provide are the types of projects authorized to be financed with voter-approved bond proceeds. Examples included on this list are not intended to limit the broader types of projects described and authorized by this measure. The types of projects authorized are:

BOND PROJECT LIST

Scope of Projects. Bond proceeds will be expended on the construction, modernization, reconstruction, rehabilitation, replacement, equipping, furnishing or otherwise improvement of school facilities of the Cupertino Union School District. Additionally, funds may be utilized for the acquisition or lease of real property for school facilities, and not for any other purpose, including teacher and administrator salaries or other school operating expenses, in compliance with California Constitution Article XIIIA, Section 1(b)(3). This measure authorizes bond projects to be undertaken at all current and future District sites.

School Facility Project List. The items presented on the following list provide are the types of projects authorized to be financed with voter-approved bond proceeds. Examples included on this list are not intended to limit the broader types of projects described and authorized by this measure. The types of projects authorized are:

  • Replace, repair, modernize deteriorating roofs, leaking pipes, outdated plumbing, sewer and gas lines, waterlines, storm drains and valves, heating, cooling, ventilation systems and electrical systems.
  • Renovate and modernize classrooms and school facilities including flooring, windows, window coverings, doors, lighting, interior and exterior finishes, and paint.
  • Expand, renovate and revitalize existing or construct new classrooms, labs and school facilities for Science, Technology, Engineering, Arts, and Math (“STEAM”) instruction.
  • Renovate, expand and modernize classroom, workroom, office and conference room spaces for libraries, media centers, mental health, wellness, counseling, and nursing.
  • Construct, expand, retrofit and equip classrooms, facilities, learning spaces and play areas for special education programs.
  • Acquire, install and/or upgrade campus safety and security systems, including intercom and emergency communications systems, lighting systems, bell systems, fire and life safety systems, installing additional fencing and gates, pedestrian access, walkways, lighting, reconfiguring entrances and drop-off/pickup locations, point of entry access, and upgrading door locks.
  • Upgrade, install, expand district-wide technology projects including computers, tablets, peripheral hardware, classroom technology tools, data backup systems, remote learning software, hardware, internet, wi-fi, acquiring and installing all necessary network infrastructure and wiring.
  • Expand, renovate and revitalize existing or construct new classrooms and school facilities for vocational and career training programs including cooking, woodshop, industrial arts and home economics.
  • Make health and safety improvements, such as installing necessary seismic reinforcements, repairing termite damage and repairing and/or replacing aging building materials including removal of hazardous materials identified either prior to or during construction.
  • Repair, modernize outdated portable classrooms or replace with permanent modern facilities.
  • Modernize, upgrade and renovate existing classrooms and facilities.
  • Construct and equip transitional kindergarten, pre-kindergarten and other preschool classrooms, learning spaces and play areas.
  • Provide adequate furniture and equipment for all classrooms.
  • Renovate, repair, replace, construct and/or install athletic playfields, playgrounds, play surfaces, gyms, other physical education and athletic facilities, locker rooms and all related improvements and equipment.
  • Develop, construct, install and improve outdoor areas including playgrounds, play structures, outdoor learning and meeting areas, hardscaping, landscaping, irrigation improvements, and building/installing shade structures and seating.
  • Construct, modernize, retrofit cafeteria, eating and serving areas, new central kitchen and multipurpose rooms.
  • Improve energy efficiency and sustainability including installation of energy efficient lighting, systems, and infrastructure, solar panels, battery storage, and electric vehicle charging stations.
  • Federal and State-mandated Americans with Disabilities Act (ADA) accessibility upgrades district-wide including site access, walkways, parking, staff and student restrooms, relocation of some existing electrical devices, drinking fountains, playground equipment and classrooms.

Incidental Expenses. Each of the bond projects described in this Bond Project List include the costs of furnishing and equipping such facilities, and all costs which are incidental but directly related to the types of projects described above. Examples of incidental costs include, but are not limited to: costs of design, engineering, architect and other professional services, facilities assessments, inspections, site preparation, utilities, landscaping, bond project construction management, administration and other planning and permitting, legal, accounting and similar costs; independent annual financial and performance audits; a customary construction contingency; demolition and disposal of existing structures; the costs of interim housing and storage during construction including relocation and construction costs incurred relating to interim facilities; the preparation or restoration of construction, renovation or remodeling; rental or construction of storage facilities and other space on an interim basis for materials and other equipment and furnishings displaced during construction; costs of relocating facilities and equipment as needed in connection with the projects; interim classrooms and facilities for students, administrators, and school functions, including modular facilities; federal and state-mandated safety upgrades; addressing unforeseen conditions revealed by construction/modernization and other necessary improvements required to comply with existing building codes, including the Field Act; access requirements of the Americans with Disabilities Act; and costs of the election; bond issuance costs; and project administration during the duration of such projects, as permitted by law.

Furnishing and Equipping. Each project is assumed to include its share of furniture, fixtures, equipment, architectural, engineering, and similar planning costs, program/project management, staff training expenses and a customary contingency for unforeseen design and construction costs. In addition to the listed projects stated above, the list also includes the acquisition of a variety of instructional, maintenance and operational equipment, including the reduction or retirement of outstanding lease obligations and interim funding incurred to advance fund projects from the list; installation of signage and fencing; payment of the costs of preparation of all facility planning, facility studies, assessment reviews, facility master plan preparation and updates, environmental studies (including environmental investigation, remediation and monitoring), design and construction documentation, and temporary housing of dislocated District activities caused by construction projects. The upgrading of technology infrastructure includes, but is not limited to, computers, projectors, portable interface devices, servers, switches, routers, modules, sound projection systems, printers, digital white boards, document projectors, telephone system, call manager and network security/firewall, wireless technology systems and other miscellaneous equipment and software.

Alternations to Scope; New Construction. The scope and nature of any of the specific projects described above may be altered by the District as required by conditions that may arise during the course of design and construction. In the event that a modernization or renovation project is more economical for or otherwise determined by the Board to be in the best interests of the District to be undertaken as new construction, this bond measure authorizes said new construction including land acquisition, relocation and construction at a new or alternative site, and/or demolition and reconstruction and/or repurposing on the original site, including an expanded site, and all costs relating thereto. In addition, this measure authorizes the acquisition of real property, including necessary rights of ways or other real property interests, required to expand District facilities, to provide access to school or other District facilities, or to provide additional school or related facilities. For any project involving rehabilitation or renovation of a building or the major portion of a building, the District shall be authorized to proceed with new construction instead, if the Board of Education determines that replacement and new construction is more economically practical than rehabilitation and renovation, considering the building’s age, condition, expected remaining life, and other relevant factors.

Interim Financing Included; Joint Use Projects Authorized. Authorized projects include paying and/or prepaying interim or previously obtained financing for the types of projects included on the Bond Project List, such as bond anticipation notes, and includes prepayment of lease payments to acquire title to facilities and/or equipment previously financed. Projects may also be undertaken on a joint use basis with other public entities.

Bond Project List Not in Order of Priority; Board Determines Prioritization. Approval of this bond measure does not guarantee that the proposed projects will be funded beyond the local revenues generated by the measure. The District’s capital needs currently exceed the amount of bonds the voters are being asked to authorize. The order in which particular projects are listed is not intended to suggest priority for funding or completion, and itemization of projects in the list above does not guarantee that all such projects will be undertaken. Project priorities will be determined by the Board of Education. The ability of the District to undertake and complete the listed projects is subject to numerous variables including the adequacy and availability of sufficient funding sources. The District is unable to anticipate all unforeseen circumstances which may prevent some of the projects listed above from being undertaken or completed.

Interpretation. The terms of this bond measure and the words used in the Bond Project List shall be interpreted broadly to effect the purpose of providing broad and clear authority for the officers and
employees of the District to provide for the school facilities projects the District proposes to finance with the proceeds of the sale of bonds authorized by this proposition within the authority provided by law, including Article XIIIA, Section 1(b)(3) of the California Constitution, Education Code Section 15000 et seq. and the Strict Accountability in Local School Construction Bonds Act of 2000. Words used in the Bond Project List such as repair, improve, upgrade, expand, modernize, renovate, and reconfigure are used to describe school facilities projects in plain English but are not intended to expand the nature of such projects beyond what is authorized by law. As such, in accordance with legal requirements, the Bond Project List does not authorize, and shall not be interpreted to authorize, expending proceeds of the sale of bonds authorized by this proposition for current maintenance, operation or repairs.

Severability. The District Board hereby declares, and the voters by approving this Bond Measure concur, that every section and part of this bond proposition has independent value, and the District Board and the voters would have adopted each provision hereof regardless of every other provision hereof. Upon approval of this measure by the voters, should any part be found by a court of competent jurisdiction to be invalid for any reason, all remaining parts hereof shall remain in full force and effect to the fullest extent allowed by law, and to this end the provisions of this bond measure are severable.