PROJECT DESCRIPTION: Replacement of sanitary sewer lines in their entirety at Stevens Creek and De Vargas Elementary Schools; replace (70)LF section of sanitary sewer line at Faria; replace all domestic water lines at Eisenhower and Garden Gate Elementary Schools; add additional storm drain to eliminate ponding at Dilworth, Faria, McAuliffe, Regnart, Stevens Creek and De Vargas Elementary Schools. Install new backflow preventors at Blue Hills, Dilworth, Eisenhower, Garden Gate, McAuliffe and Stocklmeir Elementary Schools. Work to replace the domestic water lines at Lincoln Elementary School has been postponed til Summer 2014 due to time constraints as additional time was required at both Eisenhower and Garden Gate to replace the domestic water lines and ensure the campuses were back on-line before the start of school. An existing condition of extremely low water pressure exists at Blue Hills; a solution to upsize the irrigation line that services the fields as well as the possible addition of a booster pump is in review and will be installed before the end of the year.
PROJECT BUDGET: $1,838,850
PROJECT COMPLETION: August 2013; project is substantially complete; closeout of all work except for Lincoln Elementary School is expected by end of August 2014.